Oliver Plow Works Aerial Photo

Click On Map To View Full Size

Building Key


(Dates in parenthesis note year constructed.)

1. Administration Building (1967) Demolished
2. Experimental Engineering (1948) Demolished
3. Power House (1910)
4. Boiler House (1920) Building is to be saved
5. Cut Punch Maintenance (1914)
6. Forge Shop (1948)
7. Forge Shop (1908) Building is to be saved
8. Base Fitting (1910)
9. Steel Storage (1910)
10. Welding And Drill Room (1910-13)
11. Assembly Building (1880)
12. Assembly Building (1910)
13. Warehouse (1909)
14. Shipping And Receiving Dock (1909)
15. Loading Building (1909)
16. Maintenance (1880)
17. Stock Room (1880)
18. Receiving (1880)
19. Retention Pond (Filled In)
20. Warehouse (1907) Demolished